Here is a concise summary of US patent 10232286:
US Patent: 10232286
- Title: Closed oil extraction booth with integrated ventilation system
- Current Assignee: ALIEN PROCESSING LLC
- Inventor: Linn D. Havelick
- Filing Date: December 12, 2016
- Issue Date: March 19, 2019
- Abstract: The patent describes an oil extraction booth made from securable pre-fabricated modules to create an air-tight interior workspace. It includes an inlet blower, an exhaust blower, a sensor to detect gases within the workspace, and a controller. This controller manages the speeds of the blowers based on the gas concentration detected by the sensor, operating them at a first speed for low gas levels and a second, higher speed if the gas level equals or exceeds a first predetermined value.
Plain-Language Overview of Independent Claims:
Independent Claim 1: This claim describes an oil extraction booth that includes pre-fabricated wall and ceiling panels, a door, and a ventilation system. The ventilation system features an air intake for filtered air, a vertical exhaust duct with a low-lying vent, and an exhaust fan located outside the booth above the ceiling. The booth also has ports in its walls for piping from external equipment, an electrical panel outside for controlling this equipment, and a monitoring system. The monitoring system comprises at least one sensor detecting gases or liquids inside the booth and a monitor that triggers an alarm if the concentration of these substances exceeds a first predetermined level.
Independent Claim 6: This claim details an oil extraction booth consisting of first and second pre-fabricated side modules that form an airtight interior workspace. It includes an inlet blower connected to ductwork in the first side module to bring air into the workspace, and an exhaust blower connected to ductwork in the second side module to remove air from the workspace. A sensor detects gas within the workspace, and a controller is electrically linked to both the sensor and the blowers. The controller is programmed to operate the blowers at a base speed when gas levels are below a first predetermined value and to increase their speed to a higher setting if the gas level meets or exceeds that first predetermined value.
CAFC 2026 Dockets:
A search for "CAFC 2026 dockets US10232286" did not return any direct results regarding litigation involving US Patent 10232286 in the CAFC dockets for 2026. The patent information itself indicates that "Family has litigation" and points to a US case filed in the California Northern District Court (3:26-cv-01401), but this is not a CAFC docket.
Generated 7/13/2026, 6:01:52 PM
Cases on file (1)
Group view →Specific litigation cases in our database that name US patent 10232286. The free-form analysis below may also discuss cases beyond this list.
- 3:26-cv-01401California Northern District Courtactive
Litigation summary
Past and pending lawsuits — plaintiffs, defendants, jurisdictions, outcomes, and notable rulings.
Known Litigation Involving US Patent 10232286
As of April 26, 2026, the patent US10232286 is involved in at least one known litigation case:
- Plaintiff(s): Not specified in the provided patent information.
- Defendant(s): Not specified in the provided patent information.
- Jurisdiction: California Northern District Court.
- Case Number: 3:26-cv-01401.
- Filing Date: The patent information does not explicitly state the filing date of this specific case, but it notes that "First worldwide family litigation filed" and "US case filed in California Northern District Court" with this case number.
- Outcome or Current Status: Active litigation is indicated by the patent status information, "Family has litigation".
A search for "CAFC 2026 dockets US10232286" did not yield any direct results for litigation involving this patent in the CAFC dockets for 2026. The Unified Patents portal also indicates general patent litigation search capabilities but does not provide specific case details for US10232286 directly in the search results.
Generated 7/13/2026, 6:45:38 PM
Proceedings on file (0)
All PTAB activity →AIA trial proceedings (IPR / PGR / CBM) filed at the USPTO Patent Trial and Appeal Board against this patent. Sourced from the USPTO Open Data Portal and refreshed every six hours; each proceeding number deep-links to the PTAB E2E docket.
No PTAB proceedings on file. This patent has not been challenged via IPR, PGR, or CBM. The absence is itself a signal — well-asserted patents eventually attract IPRs. The LLM analysis below may surface filings the ODP feed hasn’t indexed yet.
PTAB challenges
AIA trial proceedings at the USPTO Patent Trial and Appeal Board — IPR, PGR, and CBM. Petitioners, judge panels, claim-level invalidation outcomes from Final Written Decisions, and Federal Circuit appeals. The single most important defensive datapoint after litigation history.
Proceedings overview
There are no AIA trial proceedings on file for US Patent 10232286.
Strategic summary
As of today, July 13, 2026, all claims of US Patent 10232286 remain untested by any AIA trial proceeding. This means that a defendant facing assertion of this patent would have the full range of prior art grounds available for a potential inter partes review (IPR) or post-grant review (PGR), assuming they meet the statutory requirements for filing such a petition. The absence of PTAB activity could suggest that the patent has not been extensively asserted or that previous challenges did not result in formal AIA trials.
Recommended next steps
If you are a defendant facing assertion of US Patent 10232286, the absence of PTAB activity indicates that all claims are currently presumed valid against AIA trial challenges. A detailed prior art search would be a crucial first step to evaluate the potential for filing an IPR or PGR petition, as there are no existing PTAB decisions to consider for claim construction or invalidity findings.
Generated 7/13/2026, 6:45:42 PM
Ownership chain (2)
Asserters network →Structured records extracted from the assignment-history narrative below. Each entity links to its full ownership-network profile.
2016-12-12 · Assignment
HAVELICK, LINN DHAL EXTRACTION TECHNOLOGY LTD
internal reorg
2024-01-05 · Assignment
HAL EXTRACTIONS TECHNOLOGIES, LTDALIEN PROCESSING LLC
transfer-to-asserter
Assignment history
Inventors, original assignee, and the chain of ownership recorded with the USPTO — including the correspondent attorney who recorded each assignment, since shell-LLC chains often share one repeat-player attorney even when the entity names look unrelated. Surfaces NPE / patent-troll patterns: shell-entity transfers, known asserters in the chain, repeat correspondent fingerprints, pre-litigation assignments, and bankruptcy fire-sales.
Inventors
- Linn D. Havelick (Employer: Not specified in the patent document)
No unusual patterns such as inventors departing the original assignee within 12 months of filing are determinable from the provided information.
Original assignee
The original assignee, as listed on the issued patent, is Hal Extraction Technology Ltd. The patent document does not provide information about whether Hal Extraction Technology Ltd shipped a product embodying the claims, their primary line of business, or their current operational status.
Assignment timeline
- 2016-12-12 (executed) / recorded 2016-12-12 – Not available
- Conveyance: Assignment
- Assignor: HAVELICK, LINN D
- Assignee: HAL EXTRACTION TECHNOLOGY LTD
- Correspondent: Not available.
- Context: Original assignment from inventor to initial assignee.
- 2024-01-05 (executed) / recorded 2024-01-05 – Not available
- Conveyance: Assignment
- Assignor: HAL EXTRACTIONS TECHNOLOGIES, LTD
- Assignee: ALIEN PROCESSING LLC
- Correspondent: Not available.
- Context: Transfer of ownership.
The USPTO Assignment Center indicates that assignment records are available from August 1980 to the present. A search using the patent number US10232286 would typically provide reel and frame numbers if the assignments were recorded. However, the Google Patents legal events for this patent do not provide reel/frame numbers for the listed assignments. The information provided notes "ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS)" but does not expose the reel and frame directly.
Timeline diagram
timeline
title Ownership of US 10232286
2016 : Filed by Hal Extraction Technology Ltd
: Assigned from Havelick to Hal Extraction
2019 : Issued
2024 : Assigned to ALIEN PROCESSING LLC
NPE / troll-pattern signals
- Shell-entity transfer - Present. The patent was assigned from "HAL EXTRACTIONS TECHNOLOGIES, LTD" to "ALIEN PROCESSING LLC" in 2024. ALIEN PROCESSING LLC is described as a business registered in California and Nevada. The name "ALIEN PROCESSING LLC" could suggest a shell entity, and without further information about its products or operating business, this transfer raises a signal.
- Known asserter in the chain - Unclear. There is no information in the provided text to suggest that ALIEN PROCESSING LLC is a known NPE from public lists like Acacia Research Corp, Marathon Patent Group, etc.
- Repeat correspondent across the chain - Unclear. The correspondent information is "Not available" for both assignments.
- Cascading transfers - Not present. There are only two recorded assignments in the chain, occurring in 2016 and 2024, which is not multiple consecutive assignments in a short period.
- Pre-litigation transfer - Unclear. The assignment to ALIEN PROCESSING LLC occurred on 2024-01-05. The litigation case in the California Northern District Court (3:26-cv-01401) is noted as "First worldwide family litigation filed" but a specific filing date for this case is not provided, making it impossible to determine if the transfer occurred within 6 months prior to litigation. The patent shows "Family has litigation" with the case number, but the specific filing date for the case is not specified.
- Bankruptcy fire-sale - Unclear. While some online discussions suggest that HAL Extraction Technology Ltd. might have gone out of business, the patent records themselves do not explicitly state a bankruptcy filing or a sale due to bankruptcy. One source mentions a former employee stating, "Unfortunately, HAL Extraction is no longer in business, and they are unable to support your extraction booth".
- Privateering - Unclear. No information in the provided text suggests privateering.
- Defensive aggregator (anti-NPE) - Not present. The chain terminates with ALIEN PROCESSING LLC, which is not identified as a defensive aggregator.
Verdict
NPE — moderate confidence.
The transfer to ALIEN PROCESSING LLC in 2024, combined with the lack of clear operating information about this entity and the indication of active litigation (Case 3:26-cv-01401 in California Northern District Court), suggests a possible NPE pattern. The original assignee, Hal Extraction Technology Ltd., appears to be out of business as of late 2022/early 2023. The reassignment to ALIEN PROCESSING LLC in 2024-01-05 after the original assignee ceased operations is a strong indicator of a potential assertion play.
USPTO Assignment Center search page: https://assignmentcenter.uspto.gov/
Generated 7/13/2026, 6:45:52 PM
Prior art
Earlier patents, publications, and products that may anticipate or render the claims unpatentable.
To identify the most relevant prior art for US patent 10232286, I will use the USPTO's Patent Public Search tool. The USPTO provides a web-based search application for patents and patent application publications.
Once I access the Patent Public Search tool, I will use the "Basic search" option to look for the specific patent number 10232286, as it is a single patent number lookup.
Most Relevant Prior Art for US Patent 10232286
Based on the patent document for US10232286, the sole patent citation listed under "Patent Citations" is US20080263968A1.
- Full Citation: US20080263968A1
- Publication Date: October 30, 2008
- Filing Date: April 25, 2007
- Brief Description: US20080263968A1 describes a prefabricated rapid response accommodation structure. This structure is designed for quick assembly and deployment, providing temporary shelter or workspace. It focuses on the modularity and ease of construction for various applications.
- Claims Potentially Anticipated:
- Independent Claim 1: The concept of "a plurality of pre-fabricated wall panels" and "a plurality of pre-fabricated ceiling panels" in claim 1 of US10232286 could potentially be anticipated by US20080263968A1, which emphasizes a "prefabricated rapid response accommodation structure." The general idea of using prefabricated modules for quick assembly for a specific purpose aligns with this prior art, although the specific application (oil extraction booth with integrated ventilation) is distinct.
- Independent Claim 6: Similarly, the aspect of "first and second pre-fabricated side modules securable to each other to create a first air-tight interior work space" in claim 6 of US10232286 may be anticipated. The prior art's focus on a "prefabricated rapid response accommodation structure" implies the use of securable, modular components to create an enclosed space. The "air-tight" nature and "work space" are further refinements in US10232286, but the foundational modular construction could be seen as predated.
- Dependent Claim 10: This claim specifically mentions "at least one pre-fabricated expansion module securable between the first and second side modules." This concept of expandability through additional prefabricated modules is also a characteristic that could be found or implicitly suggested in a "prefabricated rapid response accommodation structure" designed for varying needs.
Generated 7/13/2026, 6:45:49 PM
Obviousness
Combinations of prior art that suggest the claimed invention would have been obvious under 35 U.S.C. § 103.
I'll ground this analysis with targeted searches on the references identified in the Prior Art section and on the industry standards that bear on motivation to combine.
Now let me ground the secondary-reference side of the combinations — ventilation/containment enclosures and gas-detection-driven blower control.
Let me strengthen the gas-detection → blower-speed control thread and the regulatory motivation.
Obviousness Analysis — US 10232286 under 35 U.S.C. § 103
Analyst note on scope: Per the task instruction, I am building on the Prior Art section already on the page. That section identified only one reference — US20080263968A1 (Day) — which is the sole patent citation appearing on the face of US 10232286. That single reference cannot carry a § 103 case for either independent claim, so this analysis constructs combinations using (a) the Day reference, (b) the prior-art candidates listed on the same page (Google Patents "Citations" / "Similar Documents"), and (c) industry/NPL evidence I retrieved to ground the motivation-to-combine rationale. Every reference is tagged by verification status.
1. Legal framework and critical date
Governing law. The application was filed 2016-12-12 with priority to provisional 62/320,466 filed 2016-04-09 (both dates confirmed from the patent record on this page). Because the effective filing date is after 2013-03-16, the AIA version of §§ 102/103 applies.
Critical date. 2016-04-09 (assuming all claims find § 112 support in the provisional). ⚠️ Flag: the provisional is not in the record I have. If any claim limitation is not supported by the provisional — candidates are the 500 cfm / 1,220 cfm values (claims 3, 9) and the 10%/25% LEL values (claims 4, 8), both recited in the specification only as "for example" — that claim's effective date drops to 2016-12-12, opening an eight-month window of intervening art. This should be the petitioner's first diligence item.
Framework. Graham v. John Deere Co., 383 U.S. 1 (1966) (scope/content of prior art; differences; PHOSITA level; secondary considerations); KSR Int'l Co. v. Teleflex Inc., 550 U.S. 398 (2007) (expansive rationales; predictable variations; design incentives; "obvious to try"). Under AIA § 103, the patent's own admissions in the Background Art are usable as evidence of what was known and required in the field.
2. Level of ordinary skill in the art (POSITA)
Based on the references and the problem addressed, a POSITA here is a mechanical or chemical/process engineer with ~2–5 years of experience in industrial ventilation/HVAC and hazardous-location (classified-area) facility design, including solvent handling, or equivalent. The art is genuinely a combination art — the patent itself draws on prefabricated-structure practice (E04H5/02), solvent extraction (B01D11/02), and industrial ventilation (the "Ventilation" landscape tag on the patent page). This matters: the POSITA is charged with knowledge of NFPA 70 (Class I Div. 1/2 classification), NFPA 45/33 (lab/spray enclosure ventilation), and combustible-gas detection alarm conventions, and the patent's own Background concedes these codes exist and impose exactly these requirements.
3. Corrections to the previously-generated Prior Art section
Two items must be flagged before proceeding:
- Contradiction / overreach. The Prior Art section states that Day "could potentially anticipate" claims 1, 6 and 10. This is not supportable and conflates § 102 with § 103. Anticipation requires all elements in one reference. Day discloses a disaster-relief dwelling kit and says nothing about: an exhaust duct, an exhaust fan, blowers, gas sensors, a monitor/alarm, a controller, or variable blower speed. Day is at best a § 103 primary reference for the enclosure elements — not an anticipatory reference. The Prior Art section's own framing ("could be seen as predated") is speculation; I replace it with element-level mapping below.
- PTAB section error. The earlier PTAB section advises a defendant to consider "an inter partes review (IPR) or post-grant review (PGR)." PGR is unavailable — the patent issued 2019-03-19, so the 9-month PGR window under 35 U.S.C. § 321(c) closed 2019-12-19. Only IPR remains, and only on §§ 102/103 grounds (not § 112). Also note the internal date inconsistency between the earlier sections ("As of April 26, 2026" vs. "as of today, July 13, 2026").
- Reference verified. The Prior Art section's citation of US20080263968A1 (filed 2007-04-25; published 2008-10-30; app. 11/789,654; inventor Mark O. Day) is confirmed correct by my search.
4. Reference inventory (with verification status)
| Tag | Reference | Date | What it actually discloses | Status |
|---|---|---|---|---|
| Day | US20080263968A1 — "Prefabricated rapid response accommodation structure" | pub. 2008-10-30 | Kit of pre-fab wall/roof/floor panels (foam core between metal skins); door panel and window panel integral to panels; snap-and-lock interlock giving "a secure substantially leak-proof and air-tight fit"; adjustable legs; pre-cut openings/cutouts for plumbing and electrical assemblies "so the panel(s) do not have to be cut on-site"; "an electrical panel for the exterior of said building for receiving electrical power from an outside source"; an HVAC unit fit into a pre-cut panel opening; multi-room configurations | Fully verified (Google Patents, Patents-Review, Patsnap) |
| Teagle | US6402613B1 — "Portable environmental control system" | granted 2002-06-11 | Portable system to evacuate toxic/explosive gases and VOC vapors from an interior room/confined space; indirect-drive blower "rated by regulatory authorities for hazardous conditions"; motor isolated from the gas stream "so as to minimize an unwanted source of ignition"; flexible duct; plenum + filter cabinet; venting to atmosphere; cords enclosed in UL-rated flame-resistant sleeve; high volumetric flow | Fully verified |
| CO-98 | US6110038 — CO detection/purge for a confined space (parking garage) | granted 2000-08-29 | Gas detectors in a confined space → threshold detection signal → activation circuit → motor starter → exhaust fan; timer holds fan on; re-purge after power loss | Fully verified |
| Fumehood-VAV | US5205783 — "Air flow control equipment in chemical laboratory buildings" | granted 1993 | Fume-hood exhaust control; VAV box; dedicated variable-capacity fan; "means responsive to the air flow signal for varying the speed of the blower motor"; minimum-flow bypass to avoid fume build-up | Fully verified (PDF) |
| CA'119 | CA1259119A — "Fume hood controller" | 1980s–90s | Exhaust blower driven by a blower motor … means responsive to the air flow signal for varying the speed of the blower motor | Fully verified (claim text) |
| AIVC | AIVC "Airbase" document on lab hood VAV | pre-2016 (cites NFPA 45 (1984)) | "the inside of the hood should never exceed a safe percentage of the lower explosive limit of any flammable vapors"; VAV hood "should never be totally off or at zero flow"; minimum flow maintained at all times (rule of thumb 20% of design flow); discusses two-speed exhaust fans; quantifies tempering-energy cost per cfm | Fully verified (PDF text) |
| ACME | ACME CEL(LS) MultiSet gas detection & control system datasheet | June 2011 | Gas detection control panel with LOW / HIGH / ALARM relay outputs; 4–20 mA output "to control VFD's"; explicitly marketed for "energy savings through the intermittent operation of ventilation equipment" in enclosed spaces; NDIR for CO₂ and combustible-gas (catalytic bead) sensors | Verified, dated 2011 |
| Intec | Intec Controls "CO Parking Garage Design Guidelines" | undated (⚠️ confirm) | Worked sequence: threshold #1 → start exhaust fan at minimum speed; threshold #2 → step exhaust fan up to high speed; threshold #3 → horns/strobes; analog output to VFD | Text verified; date unconfirmed |
| ParkSafe | AGS "ParkSafe" gas detection & ventilation controller datasheet | undated | "automatically control ventilation systems according to gas levels"; 0–10 VDC output to drive VFD based on gas level; Alarm Level 1/Level 2 | Text verified; date unconfirmed |
| Frog | WO2007109306A1 (Project Frog) — "Rapidly deployable modular building" | pub. 2007-09-27 | Modular building with "a sliding expansion module … attached to the shed" | Abstract/ISR snippet verified only |
| Title-only | US4944216A (Building emergency exhaust fan system); US6776708B1 (Smoke extraction system); KR100717772B1 (Fire Exhaust Ventilation Fan System); US4311198A (Smoke removal apparatus); US5326314A (industrial air cleaning) | all pre-2016 | Vertical duct + roof-level exhaust fan + low-level intake geometries | ⚠️ Title-level only — must be full-text confirmed before being cited in a petition |
| Title-only | US20180163978A1 (Biosafety Containment System); EP3124882B1 (pre-fab white chamber); US20110258943 (Modular building) | pre-2016 | Double-wall/contained-enclosure construction | ⚠️ Title-level only |
Note for the petitioner: none of Teagle, CO-98, Fumehood-VAV, CA'119, ACME, Intec, ParkSafe, or Frog appear on the face of US 10232286. Only Day does. The examiner therefore did not have these before him, which is the core IPR opportunity.
5. Independent Claim 1 — element mapping
| Claim 1 limitation | Primary disclosure | Secondary disclosure |
|---|---|---|
| Plurality of pre-fabricated wall panels | Day — wall panels WP | — |
| Plurality of pre-fabricated ceiling panels | Day — roof panels, panel roof structure | — |
| A door | Day — integral door panel DP | Teagle — doorway to the space being evacuated |
| Air intake passing filtered air into booth | Teagle — ducted intake path; plenum/filter cabinet | Day — HVAC unit in pre-cut opening |
| Vertical exhaust duct secured to a wall panel, upper end at/above ceiling, lower end near floor | Combined: Day (panel-mounted, pre-cut opening pass-throughs) + Teagle (ducted evacuation of the enclosed space) + title-only smoke/fire exhaust art (US4944216A; US6776708B1; KR100717772B1) | — |
| Exhaust vent in the lower end of the duct | Smoke/building-exhaust art (title-level); AIVC (low-level/LEL rationale) | — |
| Exhaust fan external to the booth, above the ceiling panels | Teagle (blower, hazardous-rated, motor isolated outside the vapor stream); title-only roof-fan art | Day (external electrical panel; equipment outside) |
| Ports in wall panels for piping from external equipment | Day — expressly: "prefabricated panels that contain all the necessary cutouts to accommodate prefabricated plumbing and electrical assemblies"; "no cutting out for any fixtures, pipes, wires etc. is required on site" | Teagle (flexible duct through window/opening) |
| Electrical panel on the outside of a wall panel controlling external equipment | Day — expressly: "an electrical panel for the exterior of said building for receiving electrical power from an outside source" | Teagle/standard hazardous-location practice (keep unrated electricals outside the classified boundary) |
| Sensor sensitive to gases or liquids | CO-98 (gas detectors in a confined space); ACME (combustible-gas catalytic-bead/NDIR sensors); patent's own FIG. 14 (infrared detector) | — |
| Monitor coupled to sensor, programmed to alarm above a first predetermined level | CO-98 (threshold detection signal → activation circuit → alarm/fan); ACME (LOW/HIGH/ALARM relay setpoints + visual/audible); Intec (multi-threshold sequence) | AIVC (LEL-based control objective) |
Gap analysis: Day alone supplies the pre-fab enclosure, door, snap-lock air-tight joints, pipe/electrical cutouts, and exterior electrical panel — a surprisingly large fraction of claim 1's structural elements, in a single reference already cited on the patent's face. Day supplies none of the ventilation or monitoring elements. Teagle + CO-98 + ACME fill exactly those gaps. No single reference anticipates claim 1.
6. Independent Claim 6 — element mapping
| Claim 6 limitation | Primary disclosure | Secondary disclosure |
|---|---|---|
| First and second pre-fabricated side modules securable to create a first air-tight interior work space | Day — panels secured by snap-and-lock giving "a secure substantially leak-proof and air-tight fit"; modular kit assembled on-site | Frog (modular + expansion module) |
| Inlet blower coupled to first ductwork between inner and outer walls of the first module | Teagle — blower + ductwork for the space | ⚠️ Weakest element — see § 10 |
| Exhaust blower coupled to second ductwork between inner and outer walls of the second module | Fumehood-VAV / CA'119 — exhaust blower + blower motor + speed control | Teagle — hazardous-rated blower |
| Sensor sensitive to gas in the work space | CO-98; ACME; AIVC (LEL objective) | — |
| Controller electrically coupled to control the speed of the inlet blower AND the exhaust blower, and to receive the sensor signal | CA'119 / Fumehood-VAV expressly claim "means … for varying the speed of the blower motor"; ACME (4–20 mA → VFD); ParkSafe (0–10 VDC → VFD) | Coordinated supply/exhaust tracking is a standard laboratory-VAV practice (AIVC/NPL) |
| First speed below a first predetermined value | AIVC — "minimum airflow be maintained through the hood at all times"; "never be totally off"; ACME Intec — "start the exhaust fan at minimum speed" | — |
| Second, higher speed when gas ≥ first predetermined value | Intec — "step up the exhaust fan to high speed"; CO-98 — threshold → fan activation; AIVC — two-speed exhaust fans | — |
Gap analysis: The two-threshold, two-speed, sensor-driven blower-control concept is squarely disclosed by the combination of fume-hood/VAV control art (speed-controllable blowers) with combustible-gas detection control art (threshold-driven staged fan speed). Day supplies the air-tight modular enclosure. The "ductwork between inner and outer walls" element is the only genuinely weak link.
7. Motivation to combine — articulated reasons (KSR-compliant)
A petition must supply an articulated reason with rational underpinning; conclusory "could have been combined" statements fail (see the Board's reasoning in the IPR2022-00625 excerpt retrieved in my search: "[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations", citing Belden v. Berk-Tek). The following rationales are available, in roughly descending strength:
Design incentive supplied by the applicant's own Background. US 10232286's Background Art states: "regulations and codes … often require the use of facilities equipped with explosion-proof electrical equipment, lighting and fixtures; explosion blast venting capabilities, ventilation rated for use with hazardous materials; and monitoring and alarm systems to detect the presence of hazardous conditions." This is an admission that (a) hazardous-rated ventilation, (b) blast venting, and (c) monitoring/alarm systems were known, required, and understood as the solution set. A POSITA reading Day's cheap, air-tight, relocatable panel structure has a direct, admitted incentive to outfit it for a hazardous process.
Known technique to improve a similar device in the same way. Teagle is expressly about evacuating toxic/explosive vapors and VOCs from an enclosed interior room, using a blower "rated … for hazardous conditions" whose motor is isolated from the gas stream "to minimize an unwanted source of ignition," with venting to atmosphere. Applying Teagle's ventilation scheme to Day's enclosed modular room is the paradigmatic KSR rationale (c).
Locating unrated electrical equipment outside a classified area is a standard, code-driven technique. Day already discloses "an electrical panel for the exterior of said building" and pre-cut panel openings; Teagle isolates the drive motor from the vapor stream. Placing the exhaust fan above the ceiling, outside the booth, and the control panel on the outside wall, with piping passing through pre-cut ports, is the routine NFPA 70 practice of keeping non-rated equipment outside the Class I Div. 1/2 boundary. This is a simple substitution of a known element (KSR (b)) and known technique applied to a known device ready for improvement (KSR (d)).
Predictable variation from a small fixed base flow to a staged higher flow. AIVC documents that fume hoods must never be at zero flow, must maintain a minimum flow, and discusses two- and multi-speed exhaust fans; ACME (June 2011) and Intec/ParkSafe document minimum-speed base operation with a stepped increase to high speed on a gas threshold. The "first speed / second higher speed" structure is a predictable variation of known staged ventilation control, with the recognized benefit of energy savings through intermittent operation — a benefit ACME's 2011 datasheet expressly advertises.
Combustible-gas alarm setpoints and staged relays are conventional. The claimed 10%/25%-of-LEL two-stage scheme (claims 4, 8) and the low/high/alarm relay architecture (claims 2, 7) track the standard gas-detection convention of a low setpoint (≈10% LEL) and a high setpoint (≈20–25% LEL). Applying those conventional setpoints to Teagle's hazardous-area ventilation is a design choice within the ordinary skill level, with predictable results.
Dense-vapor behavior drives low-level exhaust. The patent admits the target solvents (butane, hexane, propane, acetone, IPA) are heavier than air, and therefore exhausts near the floor. That physical fact — and the corresponding low-level/high-level venting practice — was well known (see the smoke/fire exhaust art at title level and the AIVC LEL discussion). Claim 1's "exhaust vent in the lower end of the exhaust duct" is thus the predictable engineering response, not an inventive insight.
Modular expansion is the express premise of the primary reference. Day's kit is explicitly variable in size and offers multi-room configurations; Frog (pub. 2007) discloses a "sliding expansion module … attached to the shed." Adding an expansion module between side modules (claims 10–11) is a predictable variation using a known modular-construction technique (KSR (a), (c), and "obvious to try" (e)).
8. Proposed § 103 grounds
| Ground | Claims | Combination | Core rationale |
|---|---|---|---|
| G1 | 1–5, 16 | Day + Teagle + CO-98 (optionally + ACME/Intec as evidence of the multi-stage threshold convention) | Day = pre-fab panels/ceiling/door/cutouts/ports/exterior electrical panel/air-tight joints; Teagle = hazardous-rated ventilation of an enclosed room with external, ignition-isolated blower vented to atmosphere; CO-98 = sensor→threshold→fan/trigger→alarm. |
| G2 | 6–9, 12–15 | Day + Teagle + Fumehood-VAV (or CA'119) + CO-98 | Day = air-tight securable modules; Fumehood-VAV/CA'119 = express "controller varying the speed of the blower motor"; CO-98/ACME/Intec = threshold-driven base speed vs. high speed. |
| G3 | 10–11 | G2 + Frog (WO2007109306A1) (or Day's own multi-room/variable-size disclosure) | Known expansion-module technique applied to a modular enclosure. |
| G4 | 12–14 | G2 + Title-only ducted exhaust art (US4944216A / US6776708B1 / KR100717772B1) + AIVC | Multi-level vents with a larger low-level open area = predictable layering for dense vapors; "minimize build-up of flammable concentration near the floor." ⚠️ Requires full-text verification of the title-only references. |
| G5 | 5, 15 | G2 + gas-detection relay/interlock practice (ACME) + hazardous-rated lighting practice | Shutting off the solvent supply on a third-level detection is a routine safety interlock (relay output → valve/solenoid); hazardous-rated interior fixtures are mandated by NFPA 70 for the classified volume. |
Not available: a single-reference § 102 anticipation ground. Day does not disclose any ventilation or monitoring element, and Teagle/CO-98 do not disclose pre-fabricated modular wall/ceiling panel construction.
9. Dependent claims 2–16
| Claim | Limitation | § 103 assessment |
|---|---|---|
| 2 | Monitor increases exhaust-fan speed at a second predetermined level | Obvious. Intec: threshold #1 → minimum speed; threshold #2 → "step up … to high speed." ACME: LOW/HIGH/ALARM staged relays + 4–20 mA to VFD. CO-98: threshold-triggered fan. |
| 3 | 500 cfm → 1,220 cfm | Obvious as an optimization of a disclosed range with no asserted criticality — the spec says "for example." In re Woodruff, 919 F.2d 1574 (Fed. Cir. 1990). ⚠️ Internal inconsistency to exploit: the same patent's earlier embodiment specifies a ~300 cfm single-speed fan, or 150/300 cfm for two-speed. The patent thus gives three mutually inconsistent flow regimes, undermining any "criticality" argument. |
| 4, 8 | First level ≈ 10% above LEL; second ≈ 25% above LEL | Obvious. Standard combustible-gas two-stage setpoints (low ≈10% LEL; high ≈20–25% LEL). Predictable threshold selection. |
| 5 | Monitor shuts off solvent supply at a third level | Obvious. Routine safety interlock (detection relay → supply valve). Note: the claim reads "shut of a supply of solvent" — a typo. This is a § 112(b) indefiniteness candidate but not cognizable in an IPR. |
| 7 | Audible alarm at second level | Obvious. CO-98 alarm; ACME ALARM relay; standard practice. |
| 9 | Same cfm values as claim 3 | Same analysis as claim 3. |
| 10 | At least one expansion module between the side modules (larger air-tight space) | Obvious. Day expressly contemplates variable size and multi-room kits; Frog discloses a sliding expansion module; KSR predictable variation. |
| 11 | An air-tight door on a side or expansion module | Obvious. Day integrates a door panel into the panel system and its snap-lock joints are "air-tight." Placement selection is a design choice. |
| 12, 13 | First/second/third sets of vents at three heights; first near ceiling, third near floor | Obvious in view of the admitted heavier-than-air vapor behavior and standard stratified/sweep ventilation practice. ⚠️ Confirm against title-only ducted-exhaust references. |
| 14 | Third (lowest) vent open area greater than the first and second | Obvious — a proportional relationship producing the predictable result (more airflow low, where dense vapors collect) that the spec itself claims. |
| 15 | Interior lighting fixtures rated for hazardous environments | Obvious given NFPA 70's classification requirements (the patent's own Background admits rated lighting is the code-mandated approach). ⚠️ Tension to note: claim 15 requires rated interior lighting while claim 1's stated design premise is to move all electrical equipment outside the booth to avoid rated equipment. If the doctrine of claim differentiation / the specification's stated purpose is invoked, this is a claim-drafting vulnerability, not a saving grace. |
| 16 | Duct secured to interior side of a wall panel with upper end through a ceiling panel opening | Obvious structural placement; Day's pre-cut panel openings support this; predictable mounting choice. |
10. Strongest non-obviousness counterarguments (anticipate these)
A rigorous analysis must state where the § 103 case is weak:
"Ductwork between inner and outer walls" (claim 6). This is the single most vulnerable element for the petitioner. Teagle uses flexible hose to a separate blower/plenum; Fumehood-VAV/CA'119 use exposed laboratory ductwork. Neither expressly discloses a double-wall module whose inter-wall cavity itself forms the supply/exhaust plenum. Day's panels are foam-core sandwich panels, not hollow air-plenum walls. A patent owner will argue that no reference teaches or suggests an integral double-wall plenum duct, and that the petitioner's case is impermissibly retrospective. Mitigation: search specifically for cleanroom/biosafety-containment and "air-wall" construction art (the record on this page lists US20180163978A1 "Biosafety Containment System", EP3124882B1 "prefabricated white chamber structure", and CN108351144A), plus double-wall spray booth construction.
Analogous art. Day is a disaster-relief dwelling (E04B1/343; E04H1/1205). A patent owner will argue it is non-analogous. Counter: under In re Bigio, 381 F.3d 1320 (Fed. Cir. 2004) and In re Klein, 647 F.3d 1343 (Fed. Cir. 2011), the second prong asks whether the reference is "reasonably pertinent to the particular problem" — here, providing a cheap, rapidly assembled, air-tight, relocatable enclosure. Day is reasonably pertinent to that sub-problem. Further, Day is cited on the face of the patent, so the applicant cannot credibly disclaim it.
Claim 6's coupled dual-blower speed control. The claim requires both blowers to go from first speed to second, higher speed together. Garage-CO art (CO-98, Intec) varies the exhaust fan; Fumehood-VAV varies exhaust with supply tracking. Whether the prior art expressly discloses simultaneously raising both an inlet and an exhaust blower to a second speed on a single gas signal needs verification against the full texts of CA'119 and US5205783 (the claim language retrieved from CA'119 addresses blower-motor speed variation but I did not verify a coordinated supply/exhaust teaching in its claims).
Energy savings (secondary consideration). The patent asserts 90–93% energy savings versus an equivalent paint-spray booth (500 cfm vs. 5,000–7,000 cfm). If a nexus can be shown to the claimed combination and the accused product, this is the patent owner's best Graham factor. Reprisal: the advantage is expected, not unexpected — the laboratory-ventilation literature of record (AIVC; the Labs21/Neuman presentation retrieved in my search) already quantifies make-up-air tempering cost at ~$3/cfm/yr and reports VAV energy savings of ~80% in hood-dominated labs, and ACME's June 2011 datasheet markets gas-detection-driven ventilation explicitly for "energy savings through the intermittent operation of ventilation equipment." An expected advantage carries little weight. Also, the patent gives the same 500-cfm base flow only as an example, and its own other embodiment uses 300 cfm, further weakening any criticality/nexus argument.
No commercial success. The record on this page indicates the original assignee, Hal Extraction Technology Ltd, ceased operations (a former employee quoted on the web: "Unfortunately, HAL Extraction is no longer in business"), and the patent was assigned to Alien Processing LLC on 2024-01-05. That history undercuts any secondary-indicia argument premised on commercial success or industry praise — and it also aligns with the prior sections' NPE (moderate confidence) verdict.
§ 112 issues are real but not IPR-available. The claim-5 "shut of" typo, the internal inconsistency regarding whether electrical equipment is all outside the booth (Summary) versus rated for hazardous environments (Detailed Description), and the inconsistent flow-rate regimes (150/300 cfm vs. 500/1,220 cfm) are meaningful invalidity themes — but § 112 is not a ground in an IPR. They belong in district court (case 3:26-cv-01401, N.D. Cal.) or in a motion for judgment/summary judgment posture, not before the Board.
11. Conclusion
| Question | Answer | Confidence |
|---|---|---|
| Does any single reference anticipate claim 1 or claim 6? | No. Day lacks every ventilation and monitoring element; Teagle and CO-98 lack the pre-fabricated panel/module enclosure. | High |
| Is claim 1 obvious under § 103? | Yes — moderately strong. Day + Teagle + CO-98 (+ ACME/Intec for the threshold convention). Day supplies an unusually complete envelope of claim-1 structural elements (panels, ceiling, door, air-tight joints, piping cutouts/ports, and an exterior electrical panel) and is already on the patent's face. | Moderate–High |
| Is claim 6 obvious under § 103? | Likely, with one identified soft spot. Day + Teagle + Fumehood-VAV/CA'119 + CO-98/ACME covers every limitation except the "ductwork between inner and outer walls," which requires supplemental art. | Moderate |
| Are claims 2–5, 7–9, 11–16 obvious? | Yes, as predictable variations, conventional setpoints, and design choices — subject to verification of the title-only ducted-exhaust references (claims 12–14). | Moderate–High |
| Claim 10 (expansion module) | Yes — Day's variable-size/multi-room disclosure + Frog (WO2007109306A1). | Moderate–High |
| PGR availability | No — time-barred since 2019-12-19. IPR only. | High |
Highest-value next steps for a petitioner:
- Verify the provisional's support for the 500/1,220-cfm and 10%/25%-LEL limitations to lock the effective date.
- Full-text verify US4944216A, US6776708B1, KR100717772B1, US20180163978A1 and EP3124882B1 against claims 6, 12–14 — the "inner/outer wall ductwork" gap is the case's pivot point.
- Date-verify the Intec and AGS ParkSafe documents; do not rely on undated product literature in a petition.
- Confirm the district-court service date to fix the § 315(b) one-year IPR bar, and confirm the real party in interest behind Alien Processing LLC for § 315(a)/(e) and RPI purposes.
- Depose/obtain the original design file from HAL Extraction Technology's personnel — an inventor's own pre-filing documentation of the 10%/25% LEL and 500/1,220-cfm values as chosen conventions (rather than discovered optima) would substantially neutralize the secondary-considerations defense.
Caveat on the record: the Day reference's content is fully verified from primary sources; the Teagle, CO-98, Fumehood-VAV, CA'119, AIVC, ACME, and Frog disclosures summarized above are verified from the sources cited in the table. All references marked "Title-level only" are identified from the patent page's "Similar Documents" list but their disclosures are unverified and are flagged as such throughout.
Generated 9/21/2026, 2:11:52 PM
Extensions
Patent term adjustments, term extensions, continuations, divisionals, family members, and expiration dates.
Derivative works
Defensive disclosure: derivative variations of each claim designed to render future incremental improvements obvious or non-novel.
Keep exploring
Other patents in Industrial Manufacturing (IM)
- US 7938680I'll run targeted searches for this specific patent number across USPTO resources and litigation dockets. Now let me check for any litigation or Federal Circuit activity involving this patent. US Patent 7,938,680 — Search Results Summary…
- US 5785726I'll search for the patent and any related litigation. Let me check specifically for litigation or CAFC dockets involving this patent. US Patent 5,785,726 — Summary Caveat on the date: Your prompt states the current date is April 26, 2026…
- US 3682609I'll run targeted searches for the literal number 3682609 in USPTO and CAFC contexts. Search scope and hit confirmation Searches were run for the literal string 3682609 against patent-database and court-docket sources. The only US patent…
- US 8158262I'll search for this specific patent number across the requested sources. Let me check for any CAFC litigation dockets and confirm the patent's official record. Search coverage and confidence I ran targeted searches for the literal number…
- US 269623I'll search for the specific patent number and check the litigation dockets. Patent US 269,623 — Verification Summary Important scoping note first: US 269,623 is an 1882 utility patent that is long expired. There is no CAFC docket for it…
- US 274508I'll run targeted searches for this exact patent number before summarizing. US Patent 274,508 — Analyst Summary Important framing note before the data: I searched for this number both as a patent and as a court docket identifier. Two…
- US 289518I'll run the requested searches for this specific number, then summarize. Search results — and an important caveat No USPTO grant record, assignment record, or CAFC 2026 docket entry exists for U.S. Patent No. 289,518 as a live matter…
- US 222895I'll search for this patent number across the sources you specified. Let me verify a few specifics — assignee, and the exact filing date (the OCR is garbled). Search results: US Patent 222,895 Scope note first: I searched both (a)…
This patent in court (1)
1 tracked lawsuit name US 10232286.